Moores Bridges High Pressure Pumping Station

Location: Norfolk, VA

Michael Baker International provided preliminary engineering, final design engineering, plans and specifications for the 150 MGD (ultimate capacity) new Moores Bridges High Pressure Pump Station No 2 base load pumping facility. Under the same program, Michael Baker International provided modifications and upgrades design for the existing Moores Bridges High Pressure Pumping Station No. 1 to a capacity of 50 MGD trim load pumping facility.

Project Gallery